Skip to content
Risk Register for Jira

1.0.6 - Enhanced Reporting & In-ticket control

We have introduced advanced features to enhance in-ticket control within the Risk Analyzer app:

  • Customizable Visibility: Control the visibility of the risk register within the ticket view by setting it as read-only, editable, or hidden.

  • Positioning Options: Choose to position the risk register on the left or right side of the ticket view for better integration with your workflow.

  • Clickable Matrix Cells: Experience interactive reporting where you can click on matrix cells to view associated tickets, facilitating detailed analysis and management.
  • Enhanced Reporting Interface: Analyze risk level transitions through an improved reporting interface, providing deeper insights into risk management trends.
  • Optimized Reporting Performance: Various enhancements have been implemented to improve the performance and responsiveness of reporting functionalities.

These updates are designed to streamline risk management processes, improve reporting capabilities, and enhance overall user experience with the Risk Analyzer app. For more details on how to utilize these features, please refer to our documentation or contact our support team. Your feedback helps us continuously improve our application to meet your needs effectively.